
Add to Cart
Jerky Strap extruding machine
Capacity: 400-500kg/hr (According to the product size and raw material)
Extruder Motor Power: 11kw
Feeder Power: 1.1kw
Feeder volume:40-50kg
Mold size: 500*325*80mm ( customized)
Auto Meat Strip Processing Line is an autoprocessing line can produce dog treat type meat strip. It combines two processing lines into one. With different molds, various shapes can be made, such as strip, stick, screw shape, etc. Also, we can provide all kinds of recipes to make different tastes to full the demands of pets both for nutrition and chewing hobby.
It is the first processing line to produce meat strips automatically and continuously.
The diameter and shape of meat strips can be varied by changing the molds.
Fully controlled by PLC and touch screen to reduce the labor cost, 2-3 workers are needed to operate the whole line.
The characteristics is discharging speed, output evenly, can infuse bowel flesh lump, can also be used to fill the mi bowel, flexible, convenient and freeloading, high efficiency, continuous production capacity, and cleaning convenient, suitable for various types of production enterprises.
Product Sample:
Technical Parameters
Output | Power | Required Worker | Voltage / Frequency | Dimension |
300-500kg/hr | 12.5kw | 2~3 | 380V / 50Hz | 8 x 6 x 3m |
Commissioning Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning
service, and we supply a 1-year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation, and daily salary of USD 100 are on the client’s account.