
Add to Cart
Muesli candy Cereal Bar Making Machine with Siemens PLC & WEG Motor
Introduction
1. Delivery time and term: 45 working days, FOB Qingdao
2. Package: Standard export wooden cases
3. Payment Terms: T/T or L/C (30% paid by T/T as down payment while signing the contract; 70% is paid by T/T or L/C at sight before delivery.)
4. Installation/Operation/ Service/ Maintenance Manual: In English
5. Installation team: One technician for 7 days. The client bears the technician’s round-trip flight tickets, accommodations and daily salary of USD 100.
6. Warranty: One year from the date of completion of the commissioning
7. Pre-shipment Inspection: Supplier should trial run the machinery before shipment, and send photos or videos for buyer’s inspection.
Certificate
CE CERTIFICATE provided, which strictly meet CE standards and EU countries’ import policy.
ISO 9001 CERTIFICATE provided, which strictly meet ISO 9001 standards.
Samples
Technical Layout
Advantages
2018 Hot Sale Muesli Bar Cereal Bar Peanut Bar Cutting Making Machine with Siemens PLC made by Darin Machinery
ISO9001 Certificated Quality Cereal Bar Equipment/Machine/Making Machine/Machinery, the shapes can be round, cylindrical, square, semi round, triangular and blossom, etc.
Mechnical pressing & cutting, does not hurt nuts, without waste.
ISO9001 Certificated Quality Cereal Bar Equipment/Machine/Making Machine/Machinery mechnical driving, accuracy positioning, upper and nether moulds tight fit, makes super cereal bar shaping.
Using high performance frequency inverter, easy adjust speed, high efficiency, it can produce 24-hour continuously.
ISO9001 Certificated Quality Cereal Bar Equipment/Machine/Making Machine/Machinery, moulds and hopper are both non-sticky processed. All the parts may contacts food are all non-toxic material, oil and high temperature resistance.
Cooling conveyer can be customerized as demand.
Technical Parameters
Output | Installed Capacity | Voltage / Frequency | Dimension |
400-500kg/hour | 88kw | Customerized | 11 x 4 x 2m |
Key Equipment Show
Commissioning & After-sales Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country
immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 60 are on client’s account.
Delivery
Exhibition
Machine Shows: