
Add to Cart
Muesli Bar Granola Bar Cutting Cereal Bar Making Machine Good Performance
Introduction
One Bar Provides:
10µg vitamin D
Which is the amount recommended per day by the Department of Health during pregnancy. Vitamin D contributes to the maintenance of normal bones.
400µg folic acid
The Department of Health recommends 400µg Folic Acid per day for the first 12 weeks of pregnancy. Each nutrimum bar contains this amount in full.
Vitamin B2 & B6
These vitamins contribute to the reduction of tiredness and fatigue.
One bar a day is all you need*
*as part of a varied balanced diet.
High Capaicty Muesli Bar/Granola Bar/ Sesame Bar/ Nuts Bar Cutting Machine Rectangular Shape, realizes gentle pressure forming, regular shapes ,beautiful appearance.
Peanuts material mix sugar after pour into the hopper machine, machine automatic points in material, fabric, soft pressure, cooling and demoulding, finish the delivery.
1. Combined procedures into one: Filling materials - Pressing shape - Cooling materials - Cutting muesli bar - Conveying & cooling muesli bar.
2. Material hopper is made by food grade HMWHDPE to avoid the sticking materials, also has heater to keep temperature. The filling blade is made by PTFE, and could evenly and stably fill the materials to conveyor belt, without materials wastage.
3. Controlled by Siemens PLC and touch screen with friendly interface. The staff could 180°rotate the touch screen, flexible and convenient.
4. The controller languages can be Chinese, English, French, Arabic, Spanish, Russian, etc.
Motor | WEG or Siemens | Mixing Tank and Conveying Belt | HMWHDPE |
PLC & Touch Screen | Siemens | Mixing Blade, Mold and Hopper Blade | PTFE |
Electric Parts | ABB or Schneider | Cover Body | Stainless Steel |
Technical Parameters
Output | Installed Capacity | Voltage / Frequency | Dimension | Workers Required |
400-600kg/hr | 15.2kw | 380V 50Hz | 6.65 x 1.31 x 2m | 3-4 workers |
Product Picture
Our service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 100 are on client’s account.
Contact