
Add to Cart
CE & ISO Approved Dog Chewing food processing machinery with DM Series
Introduction
Pet snacks moulding machine
Dental care, meet dog's chewing hobby
Given as reward to pets
Various size ahd lovely shape
Clamping force: 5680KN
Installed power: 89kw
Max mold size: 800*800
Shot weight: 2500g
Dimension: 8.9*2.3*2.8m
Oil tank capacity: 1000L
Molding machine is for different shapes of products like list above. Changing the moulds, then it can produce different shape. So, the final products can be many shapes. Servo motor, energy saving up to 50%, low noise, oil temperature no more than 35 degree.
Before & During & After Sales Service
Before | During | After |
1.Provide the free consultation of the equipment | 1.Help client design the factory and offering professional advice, free engineering drawing for the factory layout. | 1. Oversea install and debug the equipment. |
2.Provide the standard device and the flow chart | 2.Welcome to visit our factory or the domestic clients’ factory. | 2. Train the first-line operator. |
3. According to the clients'special requirement, offering the reasonable plan and free design helping to select the equipment. | 3.Inspect the machine before leaving the factory. | 3. Provide the basic formula |
4. Operation/ Service/ Maintenance Manual: Provided In English. | ||
5. We will provide 1-2 engineer to the client's factory for the installation and teach totally in 10 days. The client need provide room, food, round-trip transportation, visa and a nominal $100 daily subsidy per person. |
Technical Parameters
Item | Name of item | Unit | DM268 |
Injection Unit | Screw Diameter | mm | 55 |
Screw L/D Ratio | Ratio | 20 | |
Injection Volume (Theoretical) | cm | 601 | |
Injection Weight (PS) | g | 548 | |
Injection Pressure | Mpa | 185.1 | |
Injection Rate into Air | g/s | 223.7/276.1 | |
Injection Stroke | mm | 256 | |
Injection Speed | Mm/s | 95/116 | |
Screw Speed | rpm | 201/246 | |
Clamping Unit | Clamping Force | KN | 2600 |
Clamping Stroke | mm | 550 | |
Space Between Tie-bars | mm×mm | 580 x 580 | |
Max. Mould Height | mm | 600 | |
Min. Mould Height | mm | 250 | |
Ejector Stroke | mm | 160 | |
Hydraulic Ejection | KN | 68 | |
Ejector Rob Quantity | pcs | 9 | |
Others | Max. Pump Pressure | Mpa | 17.5 |
Pump Motor Power | kw | 22/30 | |
Heater Power | kw | 15.9 | |
Hopper Volume | L | 50 | |
Oil Pump Volume | L | 550 | |
Machine Weight | t | 8.5 | |
Mould Positioning Ring Diam | mm | 160 | |
Sphere Radius | mm | SR10 | |
Machine Dimension | m x m x m | 5.82 x 2 x 2 |
FAQ
1. Could we visit your factory to check the machine carefully and closely?
You’re more than welcome to visit Darin, will provide machine test running, face to face discussion and turnkey project design solution.
2. Could you afford technician team to guide our installation and commissioning?
Oversea commissioning service provided, our technician will help to install the machine, and teach local workers about operation and maintenance. Buyer should pay for the technician's round flight ticket, accommodation and salary.
3. How long is your machine's guarantee time?
One year since the machine arrive your factory.
4. If some parts break after warranty, what should we do?
Darin supply full-life after sales service, whenever new parts needed, we will help to supply new ones at reasonable price & in shortest time.
5. If we show our workshop size, can you design layout for the whole line?
Auto CAD layout will be provided as client’s workshop size.
6. What is the material of the machine?
Stainless steel, especially parts contacting with materials, conforming to food grade.
Commissioning Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning
service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 100 are on client’s account.